Projects

    • SADARA petrochemical complex Jubail

Owner :SADARA
Main Contractor :Daelim.S korea flour – USAFoster Wheelers- UK Jacobs-uk flour-uk tecnicas-spain flour Arabia-KSA, JGC Arabia-KSA, Linde-india, tecnimont-italy Dow-USA
Work discription :SASEEQ are awarded program leverage agreement (PLA) contract by SADARA to supply and integrate the standardized Siemens F & G solution

  • Engineering and Documentation
  • Supply of Siemens FACP & field devices (160 FACP’s)
  • FACP Fabrication at SASEEQ – Saudi Facilities
  • Conducting FAT in SASEEQ – Saudi Facilities
  • On- site Commissioning and system integration
  • Training to Client Representatives. After sales support
  •  
    PO Value :35400,000.00 SAR
    Current status :On – going 75% complted
    Contr award date :12 Aug, 2016
    Completion date :15 May, 2015

    • Jazan Refinery

    Owner :Saudi Aramco
    Main Contractor :Hitachi
    Work discription :FAS : Supply T & C
    PO Value :2,133,000.00 SAR
    Current status :On – going(5% Completed)
    Contr award date :May, 2014
    Completion date :Dec, 2015

    • Jazan Refinery

    Owner :Saudi Aramco
    Main Contractor :Hanwha
    Work discription :FAS : Supply T & C
    PO Value :4,489,875.00 SAR
    Current status :On – going
    Contr award date :Oct, 2014
    Completion date :Dec, 2015

    • Jazan Refinery

    Owner :Saudi Aramco
    Main Contractor :SK
    Work discription :FAS : Supply T & C
    PO Value :2,463,000.00 SAR
    Current status :On – going
    Contr award date :Nov, 2014
    Completion date :Dec, 2015

    • Tabuk& AL-Qadjh Power Plants Extension Project

    Owner :SEC
    Main Contractor :NCC Saudi Arabia
    Work discription :Design, Engineering Supply, Install, Test & Commissioning of:

  • Siemens Addressable Networked Fire alarm system
  • Siemens FM 200 Fire Suppression System
  • Fixed Foam System
  • Fire water deluge systems
  • Fire hydrants and hose cabinets
  • Fire Pumps
  • Fire water yard pipes and foam lines
  •  
    PO Value :27,650,000.00 SAR
    Current status :Completed (95% Completed)
    Contr award date :Oct, 2012
    Completion date :Dec, 2014

    • Al Daeree 380 KV Substation

    Owner :SEC
    Main Contractor :NCC Saudi Arabia
    Work discription :Design, Engineering Supply, Install, Test & Commissioning of:

  • Siemens Addressable Networked Fire alarm system
  • Siemens FM 200 Fire Suppression System
  • CO2 Fire Suppression System
  • Fire water deluge systems
  • Fire hydrants and hose cabinets
  •  
    PO Value :11,150,000.00 SAR
    Current status :On – going 90% completed
    Contr award date :May, 2012
    Completion date :Feb, 2015

    • Waist 380 KV Substation

    Owner :SEC
    Main Contractor :ABB
    Work discription :Design, Engineering Supply, Install, Test & Commissioning of:

  • Siemens Addressable Networked Fire alarm system
  • Siemens FM 200 Fire Suppression system
  • CO2 Fire Suppression syatem
  • Fire hydrants and Hose cabinets
  •  
    PO Value :5,000,000 SAR
    Current status :On – going 95% completed
    Contr award date :Apr, 2012
    Completion date :Dec, 2014

    • SADARA BSP

    Owner :SEC
    Main Contractor :NCC Saudi Arabia
    Work discription :Design, Engineering Supply, Install, Test & Commissioning of:

  • Siemens Addressable Networked Fire alarm system
  • Siemens FM 200 Fire Suppression system
  • CO2 Fire Suppression syatem
  • Fire hydrants and Hose cabinets
  •  
    PO Value :4,950,000.00 SAR
    Current status :On – going 95% completed
    Contr award date :Mar, 2012
    Completion date :Dec, 2014

    • Hail-2 BSP

    Owner :SEC
    Main Contractor :Siemens – ET Riyadh
    Work discription :Design, Engineering Supply, Install, Test & Commissioning of:

  • Siemens Addressable Networked Fire alarm system
  • Siemens Novec 1230 Fire suppression system
  • Fire Hydrants and Hose cabinets
  •  
    PO Value :6,500,000.00 SAR
    Current status :On- going(90 % Completed)
    Contr award date :Apr, 2012
    Completion date :Mar, 2015